FreeNAS Install And Configure APC UPS For Power Management
To install and configure APC UPS (Uninterruptible Power Supply) for power management on a FreeNAS system, follow these steps:
- Connect the APC UPS to the FreeNAS system using a USB cable.
- Log in to the FreeNAS web interface and go to the System → Settings → UPS section.
- In the UPS section, click the "Add" button to add a new UPS.
- Select the "apcupsd" driver and fill in the appropriate information for the UPS. You can find the required information in the manual or on the APC website.
- Click the "Test" button to verify that the UPS is functioning correctly.
- Once the test is successful, click the "Save" button to save the UPS configuration.
- In the UPS section, click the "Advanced" button to access the advanced configuration options.
- In the advanced configuration options, specify the shutdown behavior for the system when the UPS battery is low. For example, you can choose to shut down the system after a specified time, or when the battery charge drops below a certain level.
- Click the "Save" button to save the advanced configuration options.
- Restart the FreeNAS system to apply the changes.
